Keadby Power Station – October 2025


Keadby Power Station – October 2025   WM Codd was contracted by BH Construction Co. Ltd for the installation of a 121 ft (37m) Alimak Lift Structure at Keadby Power Station. The structure featured four lift access platforms and was installed using a crane and mobile elevating work platform (MEWP). Despite challenging conditions caused by … Continued